Labor Cost Calculator

Estimate labour cost by trade, hourly rate, hours worked and crew size. Add as many trade rows as the job needs, include overtime and burden, and see the total labour bill and blended rate instantly.

Trade Rows
Labor Burden
Live Labor Cost
total labor (loaded)
blended $/hr
Line Totals

About Labor Cost Calculator

Labour is usually the largest single line on a job, and the easiest to underestimate because crew size quietly multiplies the rate. The Labor Cost Calculator lets you build a list of trade rows — each with a trade, an editable hourly rate, the hours worked and how many workers — and sums them into a total labour bill and a blended hourly rate across the whole crew.

Add burden (payroll tax, insurance, benefits) as a percentage on top of raw wages, and split overtime from straight time so the premium is honest. It is labour only; pair it with the Material Cost Estimator for a complete job cost.

Features

  • Unlimited trade rows: Add carpenter, electrician, plumber, mason, painter, HVAC, roofer and more.
  • Editable rates: Pre-filled market defaults you can override per trade and region.
  • Crew multiplier: Rate × hours × workers, so crew size is explicit.
  • Burden: Add 0–40% on wages for tax, insurance and benefits.
  • Overtime split: Separate straight and 1.5× OT hours.
  • Totals: Total labour, total hours and blended hourly rate.
  • Report & export: Copy or download as text, CSV or JSON.
  • Learning guide: Trade rate table, burden and overtime explained.

How to Use

  1. Add trade rows. One row per trade/crew on the job.
  2. Set the rate. Edit the hourly rate to your market (defaults are US mid-range).
  3. Enter hours. Straight time, and a separate overtime row where needed.
  4. Set crew size. Number of workers on that trade.
  5. Add burden. A percentage on wages for loaded cost.
  6. Read totals. Total labour, hours and blended rate update live.
  7. Export. Copy or download the labour sheet.

Examples

Example 1 — Single trade. 3 carpenters × 40 h × $50 = $6,000 labour.

Example 2 — Mixed crew. Electrician 1 × 30 h × $75 = $2,250; labourer 2 × 40 h × $25 = $2,000; total $4,250.

Example 3 — With burden. $4,250 wages + 30% burden = $5,525 true labour cost.

Example 4 — Overtime. 2 roofers, 40 straight h at $55 + 10 OT h at $82.5 = $2,200 + $825 = $3,025.

Example 5 — Blended rate. $10,000 labour across 220 total hours = ~$45.5 blended hourly rate for the whole crew.

Benefits

  • No forgotten crews: Each trade is its own line, so multipliers are visible.
  • True loaded cost: Burden turns wages into real employer cost.
  • Overtime honesty: The 1.5× premium is explicit, not buried.
  • Blended rate: One number to compare against a lump-sum labour quote.
  • Pair with materials: Combine with the BOQ for full job cost.
  • Private: No account, nothing uploaded.

Frequently Asked Questions

What is a typical carpenter or electrician rate?
Rates vary by region and skill, but common US ranges are: labourer $20–30/hr, carpenter $40–55, electrician $60–85, plumber $55–80, HVAC $60–85, roofer $45–65, painter $35–50. Use the table defaults as a starting point and edit to your market.
Why multiply rate by both hours and workers?
Total labour = hourly rate × hours × number of workers on that trade. Three carpenters for 40 hours at $50/hr is $6,000, not $2,000. Crew size is the multiplier most estimates forget.
What is "labour burden"?
The employer’s cost on top of wages: payroll tax, insurance, benefits, supervision and equipment. A common rule is to add 20–35% to the raw wage to get the true loaded rate.
How do I handle overtime?
Overtime is usually 1.5× after 8 hours/day or 40/week. Add an overtime row, or use the blended-rate approach: split straight and OT hours so the premium is explicit.
Should I include subcontractor markup?
Subcontractor quotes already carry their overhead and profit. If you are pricing your own labour, add burden; if you are booking a sub, use their loaded quote as a single line.
Does this include materials?
No — this is labour only. Use the Material Cost Estimator for a bill of quantities, then combine the two for a full job cost.
Is my data stored?
No. Every calculation runs in your browser and nothing is uploaded, saved or logged.