Contractor Quote Comparison Tool

Compare up to three contractor quotes on price, normalized cost per square foot, included scope and timeline. Flag quotes that quietly omit materials, permits or cleanup, and see a clear recommendation.

Required Scope
Tick everything the job must include; quotes omitting these get flagged.
Quotes
Comparison
Recommendation
Red Flags

    About Contractor Quote Comparison Tool

    Three quotes, three totals, and somehow they are never for the same thing. The Contractor Quote Comparison Tool puts up to three bids side by side and normalises each to a cost per square foot so the numbers are actually comparable. Mark what each bid includes — materials, labour, permits, cleanup, design — and the tool flags any quote that quietly omits a required scope item.

    Add the area and timeline for each, and the tool ranks the bids, highlights the lowest complete bid, and calls out red flags like a bid that is far below the pack or missing permits. Compare like-for-like before you sign.

    Features

    • Three quotes side by side: Name, total, area and timeline for each bid.
    • Normalised $/ft²: Every bid expressed per square foot for fair comparison.
    • Scope matrix: Mark materials, labour, permits, cleanup and design per quote.
    • Required scope: Set what the job must include; omissions get flagged.
    • Recommendation: Lowest complete bid highlighted, with notes.
    • Red-flag checks: Outlier pricing and missing permits surfaced.
    • Report & export: Copy or download the comparison as text, CSV or JSON.
    • Learning guide: How to read bids and the exclusions that bite.

    How to Use

    1. Set required scope. Tick what the job must include.
    2. Enter each quote. Name, all-in total, area and weeks.
    3. Mark inclusions. Which scope items each bid covers.
    4. Read the compare. $/ft², completeness and ranking appear instantly.
    5. Check the flag. See which quotes omit required items or sit far off the pack.
    6. Export. Copy or download the comparison.

    Examples

    Example 1 — Same scope. $120k, $128k, $124k on 2,000 ft² → $60, $64, $62 /ft²; pick the $60k if scope matches.

    Example 2 — Hidden exclusion. A $95k bid looks cheapest until it omits materials — add them and it becomes $140k.

    Example 3 — Outlier. Two bids at ~$125k, one at $82k → the $82k is a red flag (missing scope or error).

    Example 4 — Timeline. $120k in 6 weeks vs $118k in 14 weeks; if you need to move in, the schedule cost matters.

    Example 5 — Permits. The low bid excludes permits; flag it and add the permit cost before comparing.

    Benefits

    • Fair comparison: $/ft² removes size differences from the debate.
    • No hidden omissions: Scope matrix exposes what each bid leaves out.
    • Confident choice: Lowest complete bid, not just lowest number.
    • Red-flag radar: Outliers and missing permits surfaced automatically.
    • Timeline awareness: Price and schedule compared together.
    • Private: No account, nothing uploaded.

    Frequently Asked Questions

    Why compare quotes per square foot?
    Headline totals hide a lot. Normalising each quote to $/ft² (or $/m²) shows whether a "cheap" bid is actually cheap for the scope, or just smaller. It is the fairest single number to compare.
    What are "scope exclusions" to watch?
    The quiet ones: materials vs labour only, permits, cleanup and debris removal, design/engineering, and utility tie-ins. A low bid that excludes materials or permits is not really lower — you pay later.
    Should I always pick the lowest bid?
    No. The lowest complete bid is the target; a bid that is low only because it omits required scope will cost more once you add the missing pieces. Compare like-for-like first.
    How does timeline factor in?
    A cheaper quote that takes twice as long may cost you in temporary housing, loan interest or lost use. Note weeks alongside price when the schedule matters.
    What is a reasonable spread between bids?
    For the same scope, bids within ~10–15% of each other are normal. A bid 30% under the pack usually excludes something or is a mistake — verify before celebrating.
    Does this include labour and materials separately?
    The tool compares the total you were quoted and what it includes. Enter the all-in number and mark the scope items each bid covers.
    Is my data stored?
    No. Everything runs in your browser; nothing is uploaded, saved or logged.